Certificates

  • Hanqi Industrial Project in Saudi Arabia

    Hanqi Industrial Project in Saudi Arabia

    Case Study: NEOM (Saudi Future City) Construction Project — Delivery and On-Site Installation Guidance for Tunnel Ventilation SystemProject OverviewProject Name: Saudi Future City (NEOM) Construction ProjectRole: Supplier of tunnel ventilation equipment and on-site installation guidanceScope of Sup
  • Supplier of the Maocuo Tai Tunnel Project

    Supplier of the Maocuo Tai Tunnel Project

    As the supplier of tunnel fans for the Mu Sita Tunnel project, our company ensures the smooth completion of the project.The Mu Sita Tunnel is located in the Tianshan Mountains and adopts a separated double-tunnel design. The left tunnel is 1,946 meters long and the right tunnel is 2,007 meters long.
  • ISO45001
  • ISO14001
  • ISO9001
  • CIC

    CIC