Case Study: NEOM (Saudi Future City) Construction Project — Delivery and On-Site Installation Guidance for Tunnel Ventilation System
Project Overview
Project Name: Saudi Future City (NEOM) Construction Project
Role: Supplier of tunnel ventilation equipment and on-site installation guidance
Scope of Supply: Two 75 kW tunnel fans (including installation accessories and control equipment), and dispatching engineers for on-site installation and commissioning
Outcome: Installation and commissioning completed on schedule; equipment passed acceptance; customer satisfaction was excellent.
![]()

Client Requirements & Challenges
The project is located overseas, requiring strict coordination for equipment transportation, customs clearance, and on-site installation.
Tunnel ventilation demands high performance in airflow, pressure, reliability, and noise control.
The construction team was unfamiliar with our fan specifications, requiring technical guidance for installation, electrical connections, and alignment.
The equipment needed to operate safely and stably under local conditions (power grid, climate, site environment) and pass performance acceptance.
Our Solution
1. Equipment Configuration
Supplied two 75 kW tunnel fans with required base components, couplings, guards, and control cabinets.
Provided bilingual (Chinese–English) installation manuals, wiring diagrams, and maintenance guidelines.
2. Logistics & Coordination
Assisted the client with export documentation, customs clearance, and transportation to ensure on-time delivery.
Coordinated with the construction contractor, supervision team, and electrical power provider regarding installation schedules and site readiness.
3. On-Site Technical Support
Dispatched experienced engineers to the site for installation supervision, mechanical alignment, electrical inspection, and foundation verification.
Ensured quality control and safety compliance throughout installation.

Implementation Process (Key Steps)
Arrival Inspection: Verified equipment integrity, foundation dimensions, and embedded components.
Mechanical Installation Guidance: Directed positioning, base installation, vibration pad placement, shaft alignment, and coupling adjustments.
Electrical & Control Setup: Checked power specifications and grounding, guided wiring work, VFD parameter configuration, and remote monitoring setup.
Pre-Operation Checks: Ensured lubrication, impeller fastening, protective devices, and safety interlocks were correctly installed.
Commissioning & Performance Testing: Conducted no-load and load tests, measuring airflow, pressure, vibration, and noise, and compared data with design requirements.
Acceptance & Training: Assisted the client with final acceptance and trained the owner’s and maintenance teams on operation and routine servicing.
Results & Client Feedback
Installation and commissioning were completed as scheduled, with all parameters meeting or exceeding contract requirements.
The fans operated smoothly with stable vibration and acceptable noise levels; control and protection systems worked reliably.
The client highly appreciated our engineers’ professionalism and responsiveness, rating the project as “excellent.”
The bilingual documentation and on-site training significantly improved the client’s maintenance capability and reduced future operational risks.

Conclusion & Ongoing Support
This NEOM (Saudi Future City) tunnel fan delivery and installation project demonstrates our strong capabilities in international project execution, on-site technical service, and after-sales support.
From equipment supply and cross-border logistics to commissioning and staff training, we delivered a complete and repeatable project execution model.
We will continue to provide remote technical support, spare parts supply, and optional periodic maintenance services to ensure long-term, safe, and stable operation of the ventilation system.
Hora de publicación: 2025-11-18 14:19:58